Once the abnormal noise or vibration is encountered in the process of silica sand, it is generally caused by the unstable bottom of the equipment or excessive material addition, which needs to be handled in time.
After running for a long time, there will be a lot of dust inside or on the surface of silica sand grinding mill. If the dust accumulates too much, it will lead to the generation...
According to the specifications of barite grinding mill and customer needs, zenith can customize all aspects of barite grinding mill equipment to achieve the goals of energy saving, low consumption and high efficiency.
At present, the rotating speed of a large number of barite grinding mills is mostly 17R / min ~ 32R / min, and the running speed of small ring gear is mostly 120r / min...
Cement water demand directly affects the water-cement ratio of concrete, which affects the strength of concrete, corrosion resistance, frost resistance, durability, the amount of vertical roller mill produced by concrete and the amount of admixture, affecting the cost and benefit of the user.
The impact of clinker on cement water demand.
The impact of the grinding process on the water demand....
For many production personnel, there are many matters needing attention when operating the equipment, but the premise is to be able to operate a high-quality equipment model. Generally speaking, the principle of barite ore grinding mill is relatively complex.Although the production efficiency of barite ore grinding plant is very high, for all users, they need to understand the basic...
In addition, the inspection before startup can also help you find the fault in time, prevent the trouble in advance, and avoid greater losses. So, what aspects need to be checked before starting the vertical roller mill?
Firmware status
Check the fasteners of the vertical roller mill for looseness. Once found, tighten them immediately, so as to reduce the probability of shutdown accident...
When vertical roller mill is broken and running with load, the locking failure is caused by the pressure loss of the hydraulic station, and the adjusting sleeve will rotate with vertical roller mill. If the operator does not find and deal with it in time, it will cause the adjusting sleeve to be stuck, which will lead to the vertical roller mill and shutdown.
The causes of adjusting sleeve...
Troubleshooting and troubleshooting: First of all, when the grinding mill is installed for the first time, the foreign objects in the tank should be removed first, and the large pulley should be turned to confirm whether it rotates flexibly and whether the belt is properly tight.
Start the inspection to confirm that the belt is running in the correct direction (the correct direction is...